Towards a conceptual reference model for project management information systems

The first difference to notice is that PRINCE2 is clearly project life cycle based with six out of eight major processes running from "Starting up a project" to "Closing a project". The remaining two, "Planning" and "Directing a project" are continuous processes supporting the other six. Each of these have their respective sub-process totaling 45 in all. Then, feeding into the system, are six "Components" some of which are documents and others that are themselves processes. Finally, PRINCE2 describes three techniques namely: "Product Based Planning", "Quality Review" and "Change Control". 2 The whole document is presented as an easy-to-follow narrative, bulleted checklists, process diagrams and timely "Hints and.

Không thể tạo bản xem trước, hãy bấm tải xuống
TÀI LIỆU MỚI ĐĂNG
15    16    4    26-11-2024
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.