FORTBILDUNGSZENTRUM FÜR TECHNIK UND UMWELT (FTU): International Management Courses 2011

This term is used to mean the arrangement under which the promoter appoints a manager with his own staff to organize the letting and supervision of construction contracts which are placed by the promoter. Design may be by the promoter’s staff, or can be placed as a separate design package or packages let by the promoter, but supervised by the manager. An advantage is that an experienced construction manager should be able to avoid or minimize the problems of co-ordinating contractors. Disadvantages include the separation of the promoter’s design requirements from construc- tion supervision, and the extra cost of the manager and his staff

Không thể tạo bản xem trước, hãy bấm tải xuống
TÀI LIỆU MỚI ĐĂNG
476    18    1    30-11-2024
463    21    1    30-11-2024
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.