An-Najah National University Faculty of Graduate Studies - Project Management for Construction Projects

All information required by the contract that is necessary to document acceptable performance of the work will be maintained in an organized manner and available electronically, daily, to WSDOT. CQA inspection reports and material sampling and testing results shall be submitted to WSDOT in electronic format within 24 hours following the inspection or test. Hard copy format of these reports and results will be available upon request by WSDOT. All quality, inspection and test activities, delays encountered, non-conforming work, and corrective action in regards to non-conforming work will be documented. All this information will be stored in a database as.

Không thể tạo bản xem trước, hãy bấm tải xuống
TÀI LIỆU MỚI ĐĂNG
147    131    1    15-05-2024
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.