Reviewers provide their comments in writing on Form RCSR or equivalent document. Comments are submitted to the DM electronically via Document Control by the date and time indicated on the review package transmittal letter. If a reviewer has no comments, he/she indicates “No Comments” on the Form RCSR and returns it to Document Control and the DM. The DM conducts a Comment Resolution meeting to document and resolve responses to review comments. Participants include the design engineer, WSDOT, the Construction Engineering Manager or designee, and others as applicable (geotechnical engineer, environmental compliance manager, utility coordinator, right-of-way, representatives from local.