Insights and Trends: Current Portfolio, Programme, and Project Management Practices

Reviewers provide their comments in writing on Form RCSR or equivalent document. Comments are submitted to the DM electronically via Document Control by the date and time indicated on the review package transmittal letter. If a reviewer has no comments, he/she indicates “No Comments” on the Form RCSR and returns it to Document Control and the DM. The DM conducts a Comment Resolution meeting to document and resolve responses to review comments. Participants include the design engineer, WSDOT, the Construction Engineering Manager or designee, and others as applicable (geotechnical engineer, environmental compliance manager, utility coordinator, right-of-way, representatives from local.

Không thể tạo bản xem trước, hãy bấm tải xuống
TỪ KHÓA LIÊN QUAN
TÀI LIỆU MỚI ĐĂNG
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.