The maturity method utilizes the principle that directly relates the strength of concrete to the cumulative temperature history of the concrete. Using this principle, the Engineer and Contractor can quickly and reliably estimate the field strength of concrete based on the maturity index (equivalent age or time-temperature factor) rather than by beam or cylinder tests in the field or the laboratory. The maturity as applied to a concrete mix is specific to that particular mix. When the mix design is changed, the Contractor may need to develop a new maturity relationship, or maturity curve in accordance with MnDOT Standard Specification 2461.