The study was conducted under the domain of four districts viz., Chhotaudepur, Dahod, Botad and Kheda districts. A random sample of 200 drip adopted farmers was taken for study. The study reveals that required time-to-time attention for minor repairs ( per cent) as most important constraint and occupied first position within the category. | Constraints faced and suggestions offered by drip adopted farmers in management of drip irrigation system