The proposed method is explained using some related examples from literature and the results are then compared with a forward serial programming method. In addition, the performance of the proposed method is measured using a mathematical metric. Our findings show that the proposed approach can provide schedules with good quality for both small and large scale problems. | Minimizing makespan of a resource-constrained scheduling problem A hybrid greedy and genetic algorithms