This study aims to determine the synchronization between the emergency power supply system of the 10 MWe nuclear power plant and the PLN gird how fast the disconnection and connection of the safety equipment system is designed. The emergency power supply system used was 2 identical 550 kVA generators | Short circuit analysis for the reliability mechanical component impact of the grid emergency power supply system in RDNK 10 MW