This article aims at developing an open tool for performing CPM based project scheduling visualization and time-cost tradeoff analysis. The success-history based parameter adaptation for Differential Evolution with linear population size reduction, denoted as LSHADE, is used for automatic time-cost tradeoff optimization. |