The research shows that the main problem to be solved is the deformation of the foundation pit, and the deformation of side wall of foundation pit tunnel is the most obvious. The maximum deformation of the side wall of the main tunnel and the auxiliary tunnel reached the maximum at 15 m. The maximum deformation of the main tunnel is about cm, and that of the auxiliary tunnel is about cm. |