Managed pressure drilling: Constant bottomhole pressure (CBHP) – Pressurized mud cap drilling (PMCD) for Thang Long JOC well HSD-BM-6P present the content: introduction to MPD, MPD variants, pressurized mud cap drilling (PMCD), constant bottomhole pressure (CBHP), ” hole preparation and strategy, ” hole decision chart, making a connection, . |