Artificial neural networks (ANNs) have been applied successfully to virtually every problem in the predictions of the settlement. However, there is not much research on predicting the settlement over time. In this paper, an ANN model is developed and compared with two traditional methods (Asaoka method and the method of Asaoka combined with Polynomial) in predicting the settlement of two cases of road construction. |