In the paper, the Station Blackout accident accompanied with IVR implementation has been analyzed for VVER1000/V320 reactor by using MELCOR code . Four SBO scenarios have been proposed for the study, among, two SBO scenarios with long-term high pressure showed that the failure of lower head occurred early due to high pressure and high temperature causing creep-rupture, and the external cooling only delayed the failure of lower vessel. |