The main switch is set to " 1 ". The lever for the nitrogen supply is opened. In the program selection the prescription selected (Shift-K2, 1 Enter) tanker with boiler is guidance-fork-shifted up to the impact in, and strutted with the pneumatic drawing in device (hand control slide valve). The barriers before the mixer must be closed. | PB-Nr Machine instruction Mixaco 1. Line-up and filling of the mixer Mixaco The main switch is set to 1 . The lever for the nitrogen supply is opened. In the program selection the prescription selected Shift-K2 1 Enter tanker with boiler is guidance-fork-shifted up to the impact in and strutted with the pneumatic drawing in device hand control slide valve . The barriers before the mixer must be closed. By simultaneous pressing of the two tracers tapping forwards the swiveling process is started. If this is terminated announces the display Filling coupled. The machinist feeds the system according to prescription or indicated as by production manager and acknowledges again with tapping forwards . The merge program runs automatically. After termination one switches off automatically. By simultaneous pressing of the tracers tapping back one down-swivels. Subsequently the pneumatic drawing in device is opened by means of hand control slide valves. Safety statement Itself no persons in the swivelling range of the mixer may do stop determine the machinist an electrical disturbance and should these also only by changing a protection to recover be may these in no case independently be executed. Safety statement Itself no persons in the swivelling range of the mixer may do stop determine the machinist an electrical disturbance and should these also only by changing a protection to recover be may these in no case independently be executed 2. Cleaning For cleaning the key position is switched with the control to cleaning. Then by simultaneous pressing of the tracers tapping is swivelled forwards the mixer. By means of hand and material rags now the funnel on the intermediate platform safety lattice beforehand to remove is cleaned. Subsequently the mixer is cleaned likewise and exhausted. By simultaneous pressing of the tracers tapping back the cleaned mixer is down-swivelled and switched the key position to operation. Subsequently the surrounding field is cleaned by