Sổ tay kỹ sư cơ khí P7

When the peak cooling load and latent heat requirements are appropriate, this less expensive type of equipment is used. In this case the air quantity is determined in a different way. The peak cooling load is first computed as times the peak sensible cooling load for the structure to match the coil SHF. The equipment is then selected to match the peak cooling load as closely as possible. The air quantity is specified by the manufacturer for each unit and is about 400 cfm/ton or m 3 /sec • kW. The total air quantity is then divided among. | AIR-CONDITIONING EQUIPMENT 1991 and light commercial cooling equipment operates with a coil SHF of with the air entering the coil at about 80 F or 27 C dry bulb and 67 F or 19 C wet bulb temperature. This equipment usually has a capacity of less than 10 tons or 35 kW. When the peak cooling load and latent heat requirements are appropriate this less expensive type of equipment is used. In this case the air quantity is determined in a different way. The peak cooling load is first computed as times the peak sensible cooling load for the structure to match the coil SHF. The equipment is then selected to match the peak cooling load as closely as possible. The air quantity is specified by the manufacturer for each unit and is about 400 cfm ton or m3 sec kW. The total air quantity is then divided among the various rooms according to the cooling load of each room. Fuel Requirements The only reliable methods available for estimating cooling equipment energy requirements require hour by hour predictions of the cooling load and must be done using a computer and representative weather data. This is mainly because of the great importance of thermal energy storage in the structure and the complexity of the equipment used. This approach is becoming much easier due to the development of personal computers. This complex problem is discussed in Ref. 3. There has been recent work related to residential and light commercial applications that is adaptable to hand calculations. The analysis assumes a correctly sized system. Figure summarizes the results of the study of compressor operating time for all locations inside the contiguous 48 states. With the compressor operating time it is possible to make an estimate of the energy consumed by the equipment for an average cooling season. The Air-Conditioning and Refrigeration Institute ARI publishes data concerning the power requirements of cooling and dehumidifying equipment and most manufacturers can .

Không thể tạo bản xem trước, hãy bấm tải xuống
TÀI LIỆU LIÊN QUAN
69    594    52
TỪ KHÓA LIÊN QUAN
TÀI LIỆU MỚI ĐĂNG
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.